Ground Screws vs. Concrete Foundations: Complete 2026 Comparison
Ground screws and concrete foundations are two main methods of construction anchoring — they differ in technology, speed, costs, and environmental impact. This guide compares both technologies based on concrete numbers and will help you decide what is suitable for your project.
What are ground screws and concrete foundations?
Ground anchors are steel elements with helical blades that are screwed into the ground without excavation using a hydraulic driving machine. Once driven, they provide immediate load-bearing capacity—no waiting. Diameters range from 76 to 150 mm, with a load-bearing capacity per point of 8–50 metric tons, depending on the soil and diameter.
Concrete foundations (footings, piers, strip foundations) are created by excavation, reinforcement with steel rebar, and pouring cement concrete. Before loading, it is necessary to wait 7–28 days for curing. The load-bearing capacity reaches 20–100+ tons per point, but at the cost of significantly higher expenses and a longer time.
Comparison in numbers
| Criterion | Ground screws | Concrete foundations |
|---|---|---|
| Installation time for 1 point | 5–15 minutes (30+ pcs/hour) | 2–4 hours (excavation + formwork + concreting) |
| Time to full load capacity | Immediately | 7–28 days (concrete curing) |
| Relative cost per 1 point | Lower | Significantly higher |
| Carbon footprint per point | ~137 kg CO₂ | ~720 kg CO₂ |
| Required equipment | 1 machine + 1–2 people | Excavator + mixer + 3–5 workers |
| Instant load capacity | ✅ Yes | ❌ No |
| Disassemblability | ✅ 100 % reversible | ❌ Destructive |
| Terrain adaptation | Slopes, uneven terrain, limited space | Requires leveling |
| Working in freezing conditions | Limited (depends on depth) | Not possible (the concrete won't withstand the frost) |
| Lifespan | 50–75+ years (galvanized steel) | 30–50 years |
| Building permit | It is often not necessary | Often yes |
| Waste | None | Construction waste 2–5 m³ per point |
| Noise level | 50–70 dB | 80–95 dB |
What is cheaper? Comparison of cost items
Direct price comparisons depend on location, soil profile, distance from the warehouse, and current equipment rates — which is why we do not provide fixed price lists. However, the key is comparing the cost structure:
Ground screws — what makes up the costs
| Item | Note |
|---|---|
| Hardware (screws) | It depends on the diameter and length |
| Machine + operator | Rental or owned machine, 1–2 operators |
| Workforce | 1–2 helpers |
| Transport and overhead costs | Generally low — the machine is mobile |
| Waste disposal | Zero |
Concrete foundations — what the costs consist of
| Item | Note |
|---|---|
| Material (concrete + reinforcement) | Main cost item |
| Excavation (excavator) | Daily rate + operation |
| Formwork and reinforcement | For each point separately |
| Workforce | 3–5 workers, multiple days |
| Removal of construction waste | 2–5 m³ per spot, paid disposal |
| Site preparation | Levelling, topsoil stripping |
Where is the biggest difference
Ground screws are typically 5–9× cheaper per anchoring point than concrete footings with comparable load-bearing capacity.
Main reasons: less material, fewer people, less equipment, zero waste.
When calculating the lifecycle (25 years), the savings are even more significant: concrete foundations require ongoing crack repairs and replacement after 30–40 years. Ground screws, when properly installed, have a lifespan of 50–75+ years with minimal maintenance.
Your project engineer will prepare a preliminary estimate for your specific project based on the geotechnical conditions and the scope of the project.
When are ground screws a better choice?
Ground screws are ideal if your project meets at least some of these conditions:
Photovoltaic and solar structures
Wooden Buildings and Modular Homes
Sloping or uneven land
Temporary or relocatable structures
Ecologically sensitive locations
Short-term projects
When is concrete still better?
There are situations where concrete foundations remain the only or significantly better choice:
Very heavy structures (50+ tons per point)
Bedrock up to 1.5 m
Underground spaces
Legislative requirement
High groundwater level or muddy layers
What foundations for your project?
Decision table
| Project type | Recommendation | Reason |
|---|---|---|
| Solar park 1–10 MWp | ✅ Ground anchors | Speed, scalability, reversibility |
| Timber structure or modular house | ✅ Ground anchors | Lightweight, fast, eco-friendly |
| Fence or fencing | ✅ Ground anchors | Simplicity, speed, ease of disassembly |
| Industrial hall up to 25 t/point | ⚠️ It depends | Screws possible with the correct diameter; consult |
| 6+ story apartment building | ❌ Concrete | High workload, legislation |
| Detached house with basement | ❌ Concrete | The Need for Underground Space |
| Structures in a Floodplain | ❌ Concrete | Standards usually require concrete foundations |
Environmental comparison
The carbon footprint of construction increases with the scale of the project—for a 100 kWp solar power plant (35 points):
Ground screws:
Concrete:
Savings:
Cement accounts for 5–8 % of global CO₂ emissions. The steel in ground anchors is 100 % recyclable—after removal, it can be resold or reused.
More about the regulatory framework for ground screws in the Czech Republic and the EU: Eurocode 7 and Ground Screws — What the Standard Says
What kind of drilling machine do you need?
For industrial projects, hand tools are not enough — ground screws with a diameter of 76–150 mm in harder soil require a hydraulic driving machine.
Glentor B80 — torque 8,000 Nm, max. screw length 2.5 m, weight 2,480 kg. The golden mean for most EPC projects: solar parks, timber structures, industrial buildings in a standard soil profile.
Glentor C65 — 6,500 Nm + MTB36 hydraulic hammer (900 J), max. screw/pile length 3.5/4.3 m. The choice for challenging terrain: harder soil, aggregate, and projects requiring DTH pre-drilling.
Both models are CE-certified, manufactured in the Czech Republic (Made in the EU), and equipped with a telematics unit for monitoring performance on the construction site.
Frequently Asked Questions
How long do ground screws last?
Galvanized ground screws have a lifespan of 50–75+ years. Concrete foundations begin to degrade after 30–40 years due to reinforcement corrosion and the alkali-silica reaction.
Do I need a building permit for ground screws?
It depends on the project and the local building authority. Small structures (fences, pergolas, photovoltaic systems up to a certain output) do not require a permit. Ground screws are generally easier to approve than concrete foundations — they are considered a reversible intervention in the soil. For details, see Eurocode 7 and screw piles.
Can I use ground screws in hard or stony soil?
Yes — screwing machine Glentor C65 with the MTB36 hydraulic hammer, it handles even difficult soil conditions. In purely rocky subsoil, a geotechnical assessment is necessary.
What is the load-bearing capacity of ground screws?
It depends on the diameter and the soil. Typically: Ø 76 mm → 8–12 t, Ø 110 mm → 15–25 t, Ø 150 mm → 30–50 t. We always recommend trial drilling or a geotechnical survey.
Do ground screws work in winter?
Yes, to a certain extent. In frozen soil, the installation time may increase. The advantage over concrete is that concrete cannot be poured in freezing temperatures at all — ground screws are therefore a winter alternative.
Can ground screws be dismantled?
Yes, 100 %. The bolt can be hydraulically unscrewed and reused or sold for recycling at 50–70 % of the purchase price. The concrete must be demolished.
Don't know which machine to choose? We will advise you.
If you are working on a specific project — a photovoltaic power plant, a wooden building, an industrial hall, or another type of foundation — contact us. We will recommend the ideal machine for your projects.
Find out also, which Glentor machine is suitable for your project type →